The station is a booster designed to supply natural gas during the injection period to the industrial site of the Krasnodar UGS.

The purpose of the project development was to carry out work to improve the reliability of gas supply to consumers and replace obsolete and physically worn-out equipment, utilities, automation and protection systems of the compressor station commissioned in 1971.

The Company's specialists have developed an informational 3D model of the Maikop CS for additional verification of the detail design documents for possible collisions. The designer supervision of this facility was carried out using 3D modeling technologies and construction support.
Projects / Development of Process Facilities
10/11/2022