Development of Process Facilities

One of the main activities of JSC Gazproektinzhiniring is the implementation of a full range of design and survey work for the transportation and storage of natural gas, and storage of oil products

The Company carries out design works within next areas:
Underground gas storages (UGS)
Linear parts of main gas pipelines (LP MGP), gas pipelines branches
Compressor stations (CS) at LP MGP and booster compressor stations (BCS)
Gas distribution (GDS) and gas measuring stations (GMS)
Loading and unloading racks, oil tank farms and warehouses of petroleum products
Additional production facilities at the industrial sites of PJSC Gazprom
Facilities for the production, storage and use of liquefied gases
The Company's specialists have designed more than four dozen gas compressor and distribution stations, many of which have been built and successfully operated in various regions of Russia. Design and detail design documentation has been developed for reconstruction, expansion and technical upgrading of more than 25 compressor stations, including main process facilities, auxiliary and environmental buildings and structures, engineering infrastructure.

Completed projects

Glebovsky UGS Modification more about the project
ERP of Ostrogozhsky Gas Pipeline Operator more about the project
High-pressure Gas Pipeline from GDS-2 Yelabuga (Central) to NKNH, TAIF-NK JSC more about the project
Maykop CS Modification more about the project
Modification of BCS-1, 2 at the Orenburg OGCF more about the project
Development of Design and Detail Design Documents for Saratov GDS-7 Modification Project more about the project